1.2 Tesla output
Reliably clears modern high-coercivity platter media where a 1 Tesla machine is marginal.
A step up in field strength with the evidence to prove it. The T-1.2 pairs a 1.2 Tesla output with an oversized drawer and a touchscreen that reports the field strength of every single cycle.
As media ages, coercivity rises. A 1 Tesla pulse still clears the great majority of drives, but the newer, higher-coercivity platters found in enterprise and hyperscale hardware need more headroom. The T-1.2 provides it without moving to a defence-grade machine.
The larger drawer is the practical win for ITAD and data-centre throughput: several server drives can be loaded together, so per-drive handling time falls sharply. And because the touchscreen records the field strength for each cycle, the destruction register becomes something an auditor can read rather than something an operator has to swear to.
Reliably clears modern high-coercivity platter media where a 1 Tesla machine is marginal.
Load several server drives in a single pass and cut per-drive handling time.
The touchscreen records the output of every cycle for your audit file.
Listed to DoD expectations, which is what most enterprise destruction policies specify.
| Specification | Proton T-1.2 |
|---|---|
| Field strength | 1.2 Tesla |
| Cycle time | Approximately 20 seconds |
| Listing | DoD |
| Operation | Drawer load |
| Field verification | LCD field report per cycle |
| Media | HDD, tapes |
The situations this is most often specified for, based on what we are asked to quote most often.
The T-1.2 produces a 1.2 Tesla output against 1 Tesla, has a larger drawer, and reports field strength per cycle. If your policy requires evidence of field strength, the T-1.2 is the minimum model that provides it.
Yes. The oversized drawer is designed for batch loading, which is where ITAD volumes come from. Many customers run the T-1.2 alongside a PDS-75 manual crusher for site work.
The confirmation and field report can be recorded manually or captured as part of your register. Where integration is needed, we scope it as part of the installation.



Tell us your volume, media, site count and compliance requirement. We will come back with a model, a costed quotation and AMC options within one business day — with no obligation.